Солнечный проект Мохаве
The site was originally reserved for the planned, never built, SEGS IX and XII. For 15 years following its construction in 1990, SEGS VIII–IX was the largest commercial solar power plant in the world, generating around 160 МВт at its peak. It is one of three separately owned sites within 40 миль (64 km) of one another, that make up the nine solar fields in the Solar Electric Generating System (SEGS #1 and 2 are at Daggett, and #3 through 7 are at Kramer Junction). Harper Lake was the last of these built, and is designated as SEGS #8 and 9. It is still online, but has been surpassed by other newer facilities, including the Mojave Solar Project.[1]
Электростанция MSP, with a combined номинальную мощность of 250 МВт (gross 280 MW), is made of two, independently operable, solar fields. The power plant cost an estimated $1.6 billion in total and entered commercial operation in December 2014.[2] The developer, компания Abengoa, has successfully secured a $1.2 billion loan guarantee from the US government for the project.[3][4][5] The plant is expected to generate 617,000 МВт·ч of power annually, enough power for more than 88,000 households and to prevent the выбросов of over 430 kilotons of CO2 a year.[6] Pacific Gas & Electric has agreed to a 25-year соглашение о покупке электроэнергии.[7]
Завод был введен в эксплуатацию 1 декабря 2014 года. [8]
Технологии

Using the desert's Используя солнечную тепловую energy, the facility generates steam in solar steam generators, which expands through a steam turbine generator to produce electrical power from twin, independently operable solar fields, each feeding a 125 MW power island. Generation is provided 100% from sun, no supplement from fossil-based energy sources. There is a gas-fired auxiliary boiler, for each field, only to provide equipment and heat-transfer fluid (HTF) freeze protection, when temperatures fall below 54 °F (12 °C).

The power cycle is a Ранкина с повторным термодинамический цикл from heat supplied via heat-transfer fluid, solar field heated up to 740 °F (393 °C). When operating, the transfer fluid enters the solar field at about 520 °F (271 °C). The из парогенератора steam exit temperature is about 720 °F (382 °C).
Each field utilizes 1128 солнечных коллекторных батарей (SCA) sited on about 710 акров (290 ha). Each SCA, model E2 from Abengoa (derived from Luz's LS-3), is 125 метров (410 ft) long and is made of 10 solar collector elements (SCE), 12 метров (39 ft) long each and 5.76 метра (18.9 ft) aperture. The E2 steel frame collector with monolithic glass reflector panels, yields a total aperture area of 691.2 square metres (7,440 sq ft). That makes a total of 779,674 square metres (8,392,340 sq ft) aperture each solar field, 1,559,347 square metres (16,784,670 sq ft) total for the plant, operating about 3,024 hours per year.
Cooling is provided by мокрыми градирнями; water for the towers and solar collector washing, is supplied from onsite groundwater wells. Water from condensed steam exits the cooling tower pump at about 80 °F (27 °C), before cycling back to the steam generator.
Производство
Производство солнечной энергии в рамках проекта Mojave Solar Project следующее (значения в МВт·ч ). [9]
| Год | Янв | февраль | март | Апр | Может | Джун | июль | Август | Сентябрь | Октябрь | Ноябрь | Декабрь | Общий |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2015 | 4,816 | 28,254 | 49,104 | 57,830 | 49,132 | 43,618 | 64,353 | 63,367 | 57,559 | 37,406 | 32,818 | 15,319 | 503,576 |
| 2016 | 4,635 | 42,348 | 41,890 | 54,991 | 75,569 | 80,338 | 87,565 | 79,153 | 68,245 | 45,346 | 30,315 | 14,512 | 624,907 |
| 2017 | 6,055 | 22,196 | 54,504 | 61,408 | 76,179 | 78,362 | 74,443 | 58,478 | 63,663 | 55,255 | 21,818 | 21,669 | 594,030 |
| 2018 | 21,688 | 37,489 | 48,733 | 42,966 | 78,035 | 84,956 | 70,267 | 71,788 | 74,929 | 51,473 | 13,976 | 8,880 | 605,180 |
| 2019 | 7,515 | 11,390 | 46,369 | 58,355 | 58,087 | 77,835 | 68,904 | 59,394 | 46,771 | 47,293 | 25,166 | 7,405 | 514,484 |
| 2020 | 12,129 | 34,521 | 36,296 | 52,915 | 76,143 | 62,317 | 84,935 | 70,617 | 42,023 | 42,479 | 27,705 | 16,334 | 558,414 |
| 2021 | 12,791 | 12,868 | 47,671 | 68,076 | 80,161 | 72,881 | 62,811 | 74,112 | 63,478 | 43,962 | 33,885 | 15,281 | 587,977 |
| 2022 | 11,423 | 20,956 | 55,560 | 66,317 | 76,011 | 80,549 | 71,095 | 66,275 | 56,939 | 48,817 | 27,423 | 14,337 | 595,702 |
| 2023 | 16,981 | 20,739 | 40,762 | 73,168 | 78,781 | 77,368 | 82,415 | 68,125 | 63,301 | 49,837 | 27,686 | 13,239 | 612,402 |
| Всего (2015–2023 гг.) | 5,196,672 | ||||||||||||
См. также
Ссылки
- ↑ «Центр интерпретации землепользования». Clui.org . Дата обращения: 18 июля 2018 г.
- ↑ csp-world.com Электростанция Abengoa Mojave мощностью 250 МВт, работающая на солнечной энергии, введена в коммерческую эксплуатацию, 2 декабря 2014 г.
- ↑ «Правительство США поддерживает солнечный проект Абенгоа, предоставляя гарантию по кредиту в размере 1.2 миллиарда долларов». Новости энергоэффективности. 19 September 2011. Archived from the original on 29 November 2011. Retrieved 8 февраля 2012.
- ↑ "Abengoa Solar, Inc. (Mojave Solar)". Программа гарантий по кредитам. DOE. Archived from the original on January 27, 2012. Retrieved 7 февраля 2012.
- ↑ Abengoa Solar Abengoa Solar - Солнечный проект в Мохаве (архивировано 2013-06-19 at the Wayback Machine
- ↑ "Кредиты - Сводка по предоставленным кредитам: Mojave Solar LLC". U.S. Government. Archived from the original on 25 February 2013. Retrieved 26 августа 2013.
- ↑ «Консультативные письма 3876-E и 3876-EA» (PDF). California Public Utilities Commission. January 11, 2012. Retrieved 7 февраля 2012.
- ↑ «Компания Abengoa вводит в эксплуатацию солнечную электростанцию мощностью 250 МВт в Калифорнии». Industry Dive. Retrieved 28 июня 2015.
- 1 2 «Солнечный проект Мохаве, ежемесячно». Браузер данных по электроэнергии. Управление энергетической информации . Retrieved 8 марта 2017.
- ↑ «Мохаве». Loan Programs Office. www.energy.gov. U.S. Department of Energy. 2011. Архивная from the original on 27 June 2017. Retrieved 12 сентября 2019.
Mojave is expected to generate 617,000 megawatt-hours of clean energy and prevent 329,000 metric tons of carbon dioxide emissions annually
Внешние ссылки
- «Солнечный проект Мохаве». Строящиеся электростанции . Abengoa Solar. Архивная от 21 июня 2012 г. Дата обращения: 7 февраля 2012 г.
- «Солнечный проект Абенгоа Мохаве». SolarPACES . Национальная лаборатория возобновляемой энергии (NREL), Министерство энергетики США (DOE). 20 октября 2011 г. Дата обращения: 7 февраля 2012 г.
- «Дело о лицензировании электростанции Abengoa Mojave Solar Project». Калифорнийская энергетическая комиссия. 18 июля 2011 г. Дата обращения: 7 февраля 2012 г.
- «Солнечная электростанция Абенгоа Мохаве (CACA 52096)». Приоритетные проекты в области возобновляемой энергетики . Бюро управления земельными ресурсами (BLM), Министерство внутренних дел (DOI). 15 июля 2011 г. Архивная от 14 января 2012 г. Дата обращения: 7 февраля 2012 г.
Источники
- Участники английской Википедии. «Mojave Solar Project». Перевод на русский. CC BY-SA 4.0 (текст и перевод).
Источники иллюстраций
- Parabolic trough at Harper Lake in California.jpg · Z22 · CC BY-SA 3.0
- Mojave Solar Project Under Construction.jpg · Z22 · CC BY-SA 3.0
- Flag of California.svg · Лицензия файла уточняется (flag)
- Wind-turbine-icon.svg · Lukipuk · CC BY-SA 3.0
- Commons-logo.svg · Лицензия файла уточняется