Shendu Highway station

Coordinates: 31°03′49″N 121°30′25″E / 31.0636°N 121.507°E / 31.0636; 121.507
From Wikipedia, the free encyclopedia
(Redirected from Shendu Highway Station)
Shendu Highway

沈杜公路
Shanghai Metro
Line 8 platform
General information
Other namesAerospace Museum (former)
LocationShendu Highway and Puxing Highway
Pujiang Town, Minhang District, Shanghai
China
Coordinates31°03′49″N 121°30′25″E / 31.0636°N 121.507°E / 31.0636; 121.507
Operated byShanghai No. 4 Metro Operation Co. Ltd. (Line 8)
Shanghai Keolis Public Transport Operation Management Co. Ltd. (Pujiang line)
Line(s)     Line 8
     Pujiang line
Platforms6 (2 island platforms and 2 side platforms)
Tracks4
Construction
Structure typeElevated
AccessibleYes
History
Opened5 July 2009 (Line 8)
31 March 2018 (Pujiang line)
Previous namesAerospace Museum (up to 31 August 2013)
Services
Preceding station Shanghai Metro Following station
Lianhang Road Line 8 Terminus
Terminus Pujiang line Sanlu Highway
towards Huizhen Road

Shendu Highway (Chinese: 沈杜公路; pinyin: Shěndù Gōnglù), formerly Aerospace Museum (simplified Chinese: 航天博物馆; traditional Chinese: 航天博物館; pinyin: Hángtiān Bówùguǎn),[1] is an interchange station between Line 8 and Pujiang line of the Shanghai Metro in the town of Pujiang, Minhang District, Shanghai, at Shendu Highway and Puxing Highway. This station serves as the southern terminus of Line 8 and the northern terminus of the Pujiang line, and opened on 5 July 2009, with the second phase of Line 8. The station became an interchange station between Line 8 and the Pujiang line on 31 March 2018, with the opening of the Pujiang line further south to Huizhen Road.[2]

Naming[edit]

The station was named Aerospace Museum until 31 August 2013, when it was changed to Shendu Highway.[1] It was expected to undergo another name change to Pujiang Country Park[3] with the opening of the Pujiang line.[4] However, this name change is no longer being considered.[5]

Station Layout[edit]

2F Side platform, doors open on the right, drop off only
Northbound      Pujiang line termination track
Island platform, doors open on the left
Southbound      Pujiang line towards Huizhen Road (Sanlu Highway)
Side platform, doors open on the right, boarding pujiang line only
Northbound      Line 8 towards Shiguang Road (Lianhang Road)
Island platform, doors open on the left
Southbound      Line 8 termination track →
G Entrances and Exits Exits 1-2

References[edit]

  1. ^ a b Shanghai Metro (2013-08-29). 11号线二期8月31日起通车试运营 (in Chinese). Retrieved 2013-09-02. 另外,8号线航天博物馆站同时更名为沈杜公路站。
  2. ^ 浦江线 3月31日起通车试运营. Shanghai Shentong Metro Group (in Chinese).
  3. ^ (simplified Chinese: 浦江郊野公园; traditional Chinese: 浦江郊野公園; pinyin: Pǔjiāng Jiāoyě Gōngyuán)
  4. ^ 注意!轨交浦江线预计明年一季度开通试运营! [Notice: Pujiang Line to begin trial operations in first quarter of 2018.] (in Simplified Chinese). 163 News. 27 December 2017.
  5. ^ Shanghai Municipal Government (2017-12-27). 注意!轨交浦江线预计明年一季度内开通试运营! (in Chinese (China)).