CU (power line)

From Wikipedia, the free encyclopedia
(Redirected from CU (Powerline))

CU is the designation of a line for high-voltage direct current (HVDC) transmission between the Coal Creek Station power plant south of Underwood, North Dakota at 47°22′24″N 101°9′23″W / 47.37333°N 101.15639°W / 47.37333; -101.15639 (Underwood Static Inverter Plant) and the Dickinson converter station near Buffalo, Minnesota at 45°06′40″N 93°48′36″W / 45.11111°N 93.81000°W / 45.11111; -93.81000 (Dickinson Static Inverter Plant).

The designation most likely refers to two Minnesota-based power generation/transmission cooperatives that originally partnered to build the Coal Creek plant and associated line - Cooperative Power Association and United Power Association, which later merged to become Great River Energy. Great River Energy recently announced that the mine-mouth plant that supplies this line, Coal Creek Station, will be decommissioned in 2022, unless another entity steps up to acquire (and continue operating) the plant, leaving the future of this line in doubt.

The CU project controversy in 1978 and 1979 was a result of protests by farm landowners in the path of the CU line right of way.

The CU line, which went in service in 1978, can transfer an electrical power of 1,000 megawatts at a symmetrical transmission voltage of 400 kV. An overhead line connection 436 miles (710 kilometers) long is used, with two conductors per pole. Thyristor static inverters are used.[1]

Crossing of HVDC powerlines[edit]

Southeast of Wing, North Dakota, at 47°02′48″N 100°05′49″W / 47.04667°N 100.09694°W / 47.04667; -100.09694 (CU crosses Square Butte) CU crosses Square Butte, another HVDC powerline. This is the only crossing point of two HVDC overhead powerlines in the Western hemisphere.

CU is the line of towers on the right, crossing the Square Butte line on the left. Near Wing, North Dakota.

Electrodes[edit]

The ground return electrode line at Coal Creek Station uses the towers of the AC line between 47°22′28.01″N 101°9′47.65″W / 47.3744472°N 101.1632361°W / 47.3744472; -101.1632361 and 47°22′43.03″N 101°10′4.94″W / 47.3786194°N 101.1680389°W / 47.3786194; -101.1680389 as support before it ends at 47°24′53.2″N 101°13′40.81″W / 47.414778°N 101.2280028°W / 47.414778; -101.2280028 (HVDC CU - Zoar Electrode Line End).

The electrode line at Dickinson converter plant runs on the towers of the main line until a tower at 45°9′27.81″N 94°2′15.06″W / 45.1577250°N 94.0375167°W / 45.1577250; -94.0375167. From this tower it runs on a line on 4 poles until its endpoint situated at 45°9′33.73″N 94°2′23.74″W / 45.1593694°N 94.0399278°W / 45.1593694; -94.0399278.